History for Hukseflux HFP01 10867
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
6290 | 2023-05-03 | Bouldin Corn Heat Flux Plate B | Installed | Bouldin Corn Heat Flux Plate B | Installed in soil under tower at 2cm depth. |
6284 | 2023-04-26 | Bouldin Corn Heat Flux Plate B | Moved | Bouldin Corn Heat Flux Plate B | Moved from field to tower in preparation for impending plowing. Not installed in soil yet. |
4794 | 2020-09-01 | Bouldin Corn Heat Flux Plate B | Moved | Bouldin Corn Heat Flux Plate B | Moved tower and soil sensors back from field in preparation for corn harvest. Soil sensors were reinstalled under the tower at -2cm depth. |
4786 | 2020-05-19 | Bouldin Corn Heat Flux Plate B | Moved | Bouldin Corn Heat Flux Plate B | Moved back into the field from being under the scaffolding at the side of the field for tilling and planting. |
4292 | 2019-12-13 | Lab none | Installed | Bouldin Corn Heat Flux Plate B | Re-installed at Bouldin Corn after re-assembling tower. Need to check if this in A/B/C location. |
4259 | 2019-12-02 | Bouldin Corn Heat Flux Plate B | Removed | Lab none | Removed from Bouldin Corn site and brought back to the lab after the tower fell down during a rain/wind storm on 2019-11-26. |
2721 | 2017-04-26 | Lab none | Installed | Bouldin Corn Heat Flux Plate B | Installed at the Bouldin Corn site with the initial set up of the tower. Temporarily at the south edge of the scaffolding until tractor work is finished. |
1954 | 2014-11-10 | Factory | Calibration | Factory | Initial factory calibration: 62.17 uV/(W/m2) |