Equipment and Calibration History
History for MorningStar PS-15 03220377
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
6749 | 2024-07-08 | Lab none | Loaned | Loaned none | Loaned to Patty for a 3-month AMP intercomparison at her new Chico agricultural tower. |
6074 | 2022-11-02 | Bouldin Alfalfa-ADEX Solar Controller Bouncer | Removed | Lab none | Removed from the Bouncer tower at the end of the 2022 advection experiment at BA |
5875 | 2022-04-25 | Lab none | Installed | Bouldin Alfalfa-ADEX Solar Controller Bouncer | Installed on the Bouncer tower for the advection experiment at BA |
5788 | 2022-04-13 | Gilbert Tract Solar Controller ADCP | Removed | Lab none | Removed from the ADCP enclosure and brought back to the lab because we want this higher capacity 15A for the advection experiment. It was replaced with a 6A controller sn 21501243. |
5702 | 2022-02-18 | Lab none | Installed | Gilbert Tract Solar Controller ADCP | Installed near the Gilbert Tract breach to measure tidal current |
5815 | 2021-11-05 | Bouldin Alfalfa-ADEX Solar Controller Bouncer | Removed | Lab none | Removed from BA bouncer tower at the conclusion of this summer's advection setup. |
5384 | 2021-07-20 | Lab none | Installed | Bouldin Alfalfa-ADEX Solar Controller Bouncer | Installed as part of the upwind tower for the advection experiment. It was installed at the tripod tower 283m northwest of the main tower to control one solar panel and one battery. |
5001 | 2020-12-01 | Vaira Solar Controller Soil CO2 | Removed | Lab none | The battery bank has died and it has been decided to focus on the forced diffusion soil CO2 and Eosense GP profile. The rest of the soil co2 equipment will be removed. |
4659 | 2012-02-16 | Lab none | Installed | Vaira none | Installed with the solar system for the new soil CO2 profile. |