Equipment and Calibration

View History

Equipment Entry

Instrument:CO2 Probe
Manufacture:Vaisala
Model No:GMP222
Serial No:Y2030049
Tag No:
Acquisition Date:2003-05-16
Project:Tonzi
Location on 2020-12-01:Lab,
Notes: 0-1% range

Documents

No documents found

History

Rec No.DateLoc FromTitleLoc ToNotes
5002 2020-12-01 Vaira CO2 probe North Profile -0.02 Removed Lab none The battery bank has died and it has been decided to focus on the forced diffusion soil CO2 and Eosense GP profile. The rest of the soil co2 equipment will be removed.
3124 2017-09-21 Vaira CO2 probe East Profile -0.08 Moved Vaira CO2 probe North Profile -0.02 Moved from East profile at -8cm to North profile at -2cm
3068 2017-09-14 Lab none Installed Vaira CO2 probe East Profile -0.08 Reinstalled at Vaira in the East profile at -8cm after lab calibration.
3029 2017-08-25 Vaira CO2 probe East Profile -0.08 Removed Lab none Removed from Vaira from East profile -8 cm position for calibration
2176 2016-02-23 Lab none Installed Vaira CO2 probe East Profile -0.08 Installed in the Vaira East profile at -8cm after lab calibration. Using a new cable.
2068 2014-12-09 Vaira CO2 probe East Profile -0.04 Location Vaira CO2 probe East Profile -0.04 Vaira East profile at -4cm
1999 2014-01-29 Lab none Installed Vaira CO2 probe East Profile -0.02 Installed at Vaira in the East profile as -2cm with new U-shaped tops on the PVC enclosures.
1438 2014-01-27 Lab none Calibration Lab none Trueppm = Probeppm*1.095 + 39.49; linear relationship between the ppm reported by the probe and the known ppm of the calibration tanks. Tanks: zero air (0ppm), 3056ppm, and 10000ppm. Ta=22.7C, P=102.1kPa. Because the lab conditions were close to factory conditions, no temperature or pressure corrections were applied. Done by: Patty.
1188 2014-01-24 Vaira CO2 probe East Profile -0.02 Removed Lab none Removed from Vaira east plot at -2cm for lab calibration
1122 2012-03-21 Lab none Installed Vaira CO2 probe East Profile -0.02 Installed at Vaira in the east set at -2cm
1397 2012-01-30 Lab none Calibration Lab none Trueppm = Probeppm*1.054 + 39.65; linear relationship between the ppm reported by the probe and the known ppm of the calibration tanks. Tanks: zero air (0ppm), 436ppm, 2238ppm, and 10000ppm (N2 bal). Ta=27.4C, P=101.9kPa. Because the lab conditions were close to factory conditions, no temperature or pressure corrections were applied. Done by: Siyan.
1374 2011-02-01 Lab none Calibration Lab none Trueppm = Probeppm*1.063 + 0.4935; linear relationship between the ppm reported by the probe and the known ppm of the calibration tanks. Tanks: zero air (0ppm), 383ppm, and 597ppm. Ta=25.5C, P=102.3kPa. Because the lab conditions were close to factory conditions, no temperature or pressure corrections were applied. Done by: Melanie.
1359 2010-02-11 Lab none Calibration Lab none Trueppm = Probeppm*1.067 + 1.209; linear relationship between the ppm reported by the probe and the known ppm of the calibration tanks. Tanks: zero air (0ppm), 383ppm, 597ppm, and 2238ppm. Ta=21.8C, P=102.3kPa. Because the lab conditions were close to factory conditions, no temperature or pressure corrections were applied. Done by: Jaclyn.
6 2009-12-01 Factory Calibration Factory Vaisala factory calibration 0-1% - certificate on file.
Problem: none
Action: Updated coefficients and adjusted unit.