Equipment and Calibration History

History for Hukseflux HFP01 10861

Rec No.DateLoc FromTitleLoc ToNotes
6289 2023-05-03 Bouldin Corn Heat Flux Plate C Installed Bouldin Corn Heat Flux Plate C Installed in soil under tower at 2cm depth.
6283 2023-04-26 Bouldin Corn Heat Flux Plate C Moved Bouldin Corn Heat Flux Plate C Moved from field to tower in preparation for impending plowing. Not installed in soil yet.
4795 2020-09-01 Bouldin Corn Heat Flux Plate C Moved Bouldin Corn Heat Flux Plate C Moved tower and soil sensors back from field in preparation for corn harvest. Soil sensors were reinstalled under the tower at -2cm depth.
4787 2020-05-19 Bouldin Corn Heat Flux Plate C Moved Bouldin Corn Heat Flux Plate C Moved back into the field from being under the scaffolding at the side of the field for tilling and planting.
4293 2019-12-13 Lab none Installed Bouldin Corn Heat Flux Plate C Re-installed at Bouldin Corn after re-assembling tower. Need to check if this in A/B/C location.
4260 2019-12-02 Bouldin Corn Heat Flux Plate C Removed Lab none Removed from Bouldin Corn site and brought back to the lab after the tower fell down during a rain/wind storm on 2019-11-26.
2723 2017-04-26 Lab none Installed Bouldin Corn Heat Flux Plate C Installed at the Bouldin Corn site with the initial set up of the tower. Temporarily at the south edge of the scaffolding until tractor work is finished.
1952 2014-10-29 Factory Calibration Factory Initial factory calibration: 62.59 uV/(W/m2)