Equipment and Calibration History
History for Kipp & Zonen PAR-LITE 050597
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
5184 | 2021-03-11 | Lab none | Installed | Hill Slough PAR Sensor Incoming | Installed at Hill Slough with site setup in incoming position |
5132 | 2021-02-26 | Sherman Wetland-Temp1 PAR Sensor Incoming | Removed | Lab none | Removed from the decommissioned temporary location and brought back to the lab to be cleaned up. |
4964 | 2020-11-12 | Sherman Wetland-Temp1 PAR Sensor Incoming | Notes | Sherman Wetland-Temp1 PAR Sensor Incoming | Tried to remove from boom with decommissioning of Sherman Wetland Temp tower, but it was stuck. Need vice grips and/or drill. |
4349 | 2020-01-30 | East Pond PAR Sensor Incoming | Moved | Sherman Wetland-Temp1 PAR Sensor Incoming | Removed with the decommissioning of the EP tower and installed at the new SW Temporary site 1250m upwind of the Permanent Tower. |
3411 | 2018-04-17 | Lab none | Installed | East Pond PAR Sensor Incoming | Installed at EP tower as part of initial site set up. This sensor is in the upward facing position collecting incoming PAR |
3089 | 2017-09-26 | East End-Temp2 PAR Sensor Reflected | Removed | Lab none | Brought back to the lab with the decommissioning of the East End closed canopy temporary tower 2 |
2870 | 2017-06-14 | Lab none | Installed | East End-Temp2 PAR Sensor Reflected | Installed on the East End Temporary Tower #2 Closed Canpoy location with the initial tower set up. |
2705 | 2017-04-04 | Twitchell Rice PAR Sensor Incoming | Removed | Lab none | Removed with Twitchell Rice tower decommissioning. |
1738 | 2009-04-03 | Lab none | Installed | Twitchell Rice PAR Sensor Incoming | Installed with the initial set up of the Twitchell Rice tower. This sensor is pointing up. |
5415 | 2005-07-11 | Factory none | Calibration | Factory none | Initial factory calibration 5.35 uV/(uE/m2/s) |