Instrument:CO2 Probe
Manufacture:Vaisala
Model No:GMP221
Serial No:Y0850004
Tag No:
Acquisition Date:2003-02-21
Project:Tonzi
Location on 2021-08-11:Lab,
Notes: 0-2% range

Documents

No documents found

History

Rec No.DateLoc FromTitleLoc ToNotes
5414 2021-08-11 Tonzi-SoilCO2 CO2 Probe Tree2 Profile -0.16 Removed Lab none Removed from -16cm in the soil co2 profile near LiuKang's tree. This profile has not been running for a while due to a break in the power line. This style of measurements are being replaced by forced diffusion chambers.
3065 2017-09-14 Lab none Installed Tonzi CO2 Probe Tree2 Profile -0.16 Installed at Tonzi in the Tree 2 profile at -16cm after lab calibration. This is a new installation with new holes dug.
1462 2014-05-27 Lab none Calibration Lab none Trueppm = Probeppm*0.743 + -1252; linear relationship between the ppm reported by the probe and the known ppm of the calibration tanks. Tanks: zero air (0ppm), 2238ppm, and 3056ppm. Ta=20.19C, P=101.3kPa. Because the lab conditions were close to factory conditions, no temperature or pressure corrections were applied. Done by: Madeleine.
2006 2014-04-22 Vaira CO2 probe West Profile -0.02 Removed Lab none Removed from Vaira West profile at -2cm, replaced by sn K1310103
2019 2014-03-18 Vaira CO2 probe West Profile -0.04 Moved Vaira CO2 probe West Profile -0.08 At Vaira in the West profile this probe was moved from the -4cm location to -8cm
2003 2014-01-29 Lab none Installed Vaira CO2 probe West Profile -0.04 West profile as -4cm with new U-shaped tops on the PVC enclosures.
1440 2014-01-27 Lab none Calibration Lab none Trueppm = Probeppm*1.056 + -1146; linear relationship between the ppm reported by the probe and the known ppm of the calibration tanks. Tanks: zero air (0ppm), 3056ppm, and 10000ppm. Ta=22.7C, P=102.1kPa. Because the lab conditions were close to factory conditions, no temperature or pressure corrections were applied. Done by: Patty.
1192 2014-01-24 Vaira CO2 probe West Profile -0.04 Removed Lab none Removed from Vaira west plot at -4cm for lab calibration
1126 2012-03-21 Lab none Installed Vaira CO2 probe West Profile -0.04 Installed at Vaira in the west set at -4cm
1410 2012-02-06 Lab none Calibration Lab none Trueppm = Probeppm*1.016 + -32.48; linear relationship between the ppm reported by the probe and the known ppm of the calibration tanks. Tanks: zero air (0ppm), 436ppm, 2238ppm, and 10000ppm (N2 bal). Ta=24.2C, P=101.5kPa. Because the lab conditions were close to factory conditions, no temperature or pressure corrections were applied. Done by: Siyan.
1401 2012-02-03 Lab none Calibration Lab none Trueppm = Probeppm*1.001 + -1162; linear relationship between the ppm reported by the probe and the known ppm of the calibration tanks. Tanks: zero air (0ppm), 436ppm, 2238ppm, and 10000ppm (N2 bal). Ta=26.6C, P=101.6kPa. Because the lab conditions were close to factory conditions, no temperature or pressure corrections were applied. Done by: Siyan.
1291 2010-04-06 Lab none Installed Sherman Island Installed at Sherman Island in Set A at -8cm.
1356 2010-02-03 Lab none Calibration Lab none Trueppm = Probeppm*1.058 + 48.2; linear relationship between the ppm reported by the probe and the known ppm of the calibration tanks. Tanks: zero air (0ppm), 383ppm, 597ppm, and 2238ppm. Ta=24.1C, P=101.2kPa. Because the lab conditions were close to factory conditions, no temperature or pressure corrections were applied. Done by: Jaclyn.
7 2009-12-01 Factory Calibration Factory Vaisala factory calibration 0-2% - certificate on file.
Problem: none
Action: Updated coefficients and adjusted unit.
19 2005-05-16 Tonzi CO2 Probe Open Profile -0.16 Removed Lab none Removed from Tonzi in the east open area set at 16cm deep
17 2003-02-17 Lab none Installed Tonzi CO2 Probe Open Profile -0.16 Installed at Tonzi in the east open set at 16cm deep.
 
 