5093 2021-02-03 Lab none Installed Bouldin Corn PAR Sensor Incoming Reinstalled on the BC tower after cleaning and inspection in the lab after being removed after the tower fell last week
5074 2021-01-29 Bouldin Corn PAR Sensor Incoming Removed Lab none Removed due to the tower falling over in the storm near midnight on 2021-01-26/27. Completely submerged
4285 2019-12-13 Lab none Installed Bouldin Corn PAR Sensor Incoming Re-installed at Bouldin Corn in incoming position after re-assembling tower.
4252 2019-12-02 Bouldin Corn PAR Sensor Incoming Removed Lab none Removed from Bouldin Corn site and brought back to the lab after the tower fell down during a rain/wind storm on 2019-11-26.
2719 2017-04-26 Lab none Installed Bouldin Corn PAR Sensor Incoming Installed in the incoming position at the Bouldin Corn site with the initial set up of the tower.
1976 2014-09-09 Factory none Calibration Factory none Initial factory calibration: 8.12 uV/(umol/m2/s), 470 Ohm: y=mx+b 123.2 0