Equipment and Calibration History

History for Vaisala HMP155 T2930114

Rec No.DateLoc FromTitleLoc ToNotes
6568 2024-02-16 Lab none Loaned Loaned none Loaned sensor and cable to Sylvain and J.J. (UCSC) to use at the Elkhorn Slough Yampah tower while they wait for a replacement sensor/repairs.
6273 2023-04-26 Lab none Installed Cal Kit RH & Temp Installed as part of the calkit at Tonzi Floor
6114 2022-11-30 Bouldin Alfalfa-ADEX RH & Temp Bouncer Lower Removed Lab none Removed from the main tower and brought back to the lab at the end of the ADEX intercomparison
5847 2022-04-25 Lab none Installed Bouldin Alfalfa-ADEX RH & Temp Bouncer Lower Installed on the main post at the Bouncer tower at 2.42m alg for the advection experiment at BA
5785 2022-04-12 Cal Kit RH & Temp Removed Lab none Removed from the Tonzi Tower at the end of the inter-comparison
5729 2022-03-10 Cal Kit RH & Temp Moved Cal Kit RH & Temp Moved from VR radiometer boom to TZ Tower top
5682 2022-02-09 Lab none Installed Cal Kit RH & Temp Installed at Varia as part of the CalKit
5583 2021-11-18 Bouldin Alfalfa Removed Lab none Removed from BA tower at the conclusion of the HMP155 intercomparison.
5573 2021-11-05 Bouldin Alfalfa Moved Bouldin Alfalfa none Removed from main tower (lower position) at the conclusion of this year's advection experiment and installed on the main tower for an HMP intercomparison
5451 2021-09-03 Lab none Installed Bouldin Alfalfa none Installed on the main BA tower (lower location) for the advection experiment