Equipment and Calibration History
History for Apogee SI-121 1624
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
6983 | 2024-10-29 | Lab none | Installed | Tonzi Infrared Temperature StemFlux North | Installed north of the Floor tower to measure tree trunk temperatures for Kuno's stem flux experiment |
6953 | 2024-10-23 | Gilbert Tract | Removed | Lab none | Removed from "Upland" station in Gilbert Tract at the conclusion of Robert's thermocouple experiment |
6861 | 2024-09-19 | Lab none | Installed | Gilbert Tract none | Installed at the Gilbert Tract "upland" station for Robert's temperature campaign |
5893 | 2022-06-07 | Tonzi Infrared Temperature Ref Panel B | Removed | Lab none | Disconnected and packed up on 05/26 but brought back to the lab today - no longer needed |
5351 | 2021-06-24 | Lab none | Installed | Tonzi Infrared Temperature Ref Panel B | Reinstalled after several tries where the wiring was confused. Originally removed because a wasp filled its port with mud and larva. |
5290 | 2019-01-13 | Borrowed none | Installed | Tonzi Infrared Temperature Ref Panel B | Installed on a post pointing to the northeast and slightly downward at the south facing concrete reference panel near the Floor solar panels. The panel also was five thermocouples embedded in it. |