Equipment and Calibration History
History for Vaisala GMM222 L2010070
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
5004 | 2020-12-01 | Vaira CO2 probe North Profile -0.08 | Removed | Lab none | The battery bank has died and it has been decided to focus on the forced diffusion soil CO2 and Eosense GP profile. The rest of the soil co2 equipment will be removed. |
4650 | 2017-09-21 | Vaira CO2 probe North Profile -0.08 | Location | Vaira CO2 probe North Profile -0.08 | This probe did not change location |
3071 | 2017-09-14 | Lab none | Installed | Vaira CO2 probe North Profile -0.08 | Reinstalled at Vaira in the North profile at -8cm after lab calibration. |
2995 | 2017-08-25 | Vaira CO2 probe North Profile -0.08 | Removed | Lab none | Removed from Vaira North profile, -8 position and brought back to the lab for calibration |
2182 | 2016-02-23 | Lab none | Installed | Vaira CO2 probe North Profile -0.08 | Installed in the Vaira North profile at -8cm after lab calibration. |
2156 | 2016-02-04 | Vaira CO2 probe North Profile -0.08 | Removed | Lab none | Removed from Vaira North profile at -8cm for calibration |
2044 | 2015-11-03 | Lab none | Installed | Vaira CO2 probe North Profile -0.04 | Installed in Vaira North profile at -4cm to replace sn Y1950005 |