<--2014-08-27 12:30:00 | 2014-09-08 13:00:00-->Other sites visited today: Sherman Island | Mayberry | Twitchell Alfalfa | East End | West Pond
Phenocam link: Searching...
Twitchell Rice: 2014-09-04 13:15:00 (DOY 247)
Author: Joe Verfaillie
Others: Patty
Summary: field drained, standard fieldwork, 23x clock reset by 17min, power issues.
Twitchell Rice 2014-09-04 I arrived about 1:15 with Patty. It was clear, sunny and warm with a light breeze from the west. The field is drained and the rice is yellow with seed in most places. Automatic propane canons are set up in a couple of places to scare birds. Patty did LAI, veg height, and clip plots. I did spectra, and serviced the tower. The 7700 read: 1.98ppm, 45.6 RSSI – 73.6 after cleaning. I tested the auto spray cleaning system and it worked well. The 7500 read: 390ppm CO2, 678mmol/m3 H2O, 94.9SS, 100.99kPa, 29.12C The 23x clock was behind by 17min. I reset it from 12:20 to 12:37. The 7550 clock was okay. The camera had only 65 images. It looks like there might have been an overnight drop out in the data systems at a later date. Time to swap out the battery bank. |
Veg Height (cm): Tape measure from ground to top of plant - seeding heavily
70, 70, 70, 68, 66, 67, 67, 67, 70, 65, 70, 65, 70, 70, 66, 67, 78, 76, 75, 70, avg = 69.4, stdev = 3.54
0 photos found
6 sets found
12 TW_met graphs found
5 TW_flux graphs found
Can't check TWSI_mixed
Can't check SIMBTWEE_met
1 TW_cam graphs found
Can't check TATWBABCSB_cam