<--2013-04-26 14:00:00 | 2013-05-24 14:00:00-->Other sites visited today: Sherman Island | Mayberry | Twitchell Rice | West Pond
Phenocam link: Searching...
DWR Corn: 2013-05-09 09:00:00 (DOY 129)
Author: Cove Sturtevant
Others: Joe
Summary: Moved tower east of wetland construction. All running well. No ground instruments installed.
DWR Corn 2013-05-09 Joe and I arrived around 09:00 PDT. It was sunny, windy, and cool. We dismantled the tower and set it back up near the levee just east of the planned construction of the new wetland. Sheep were grazing at the new site, although not within the tower footprint. The guard/herding dogs were not happy we were there but Joes ingenious good dog was surprisingly effective at calming down the one that came over to bite us. Tower reconstruction went very well and data is currently collecting. No ground sensors are installed, including heat flux, soil moisture, soil temperature, and water table. The camera looks to the northwest of the tower. We did not have a level with us so we eyeballed the radiation instruments. Adjust to level next time. |
5 photos found
20130509DC_TowerDown.jpg ( 2013-05-09 10:26:55 ) Full size: 1920x1440
Cove packing up the pieces after taking down the DWR Corn tower
20130509WC_WetlandConstructionSite2.jpg ( 2013-05-09 13:51:49 ) Full size: 1920x1440
Temporary location during wetland construction
20130509DC_HaveTowerWillTravel.jpg ( 2013-05-09 10:38:45 ) Full size: 1920x1440
Have tower, will travel
20130509WC_WetlandConstructionSite1.jpg ( 2013-05-09 13:51:25 ) Full size: 1920x1440
Temporary location of the Corn tower during wetland construction
DC_autocam_20130508_1315.jpg ( 2013-05-08 13:15:02 ) Full size: 1920x1440
Ditch clearing
3 sets found
Can't check DC_mixed
3 DC_mixed graphs found
7 DC_met graphs found
3 DC_flux graphs found