5092 2021-02-03 Lab none Installed Bouldin Corn Narrow Band PRI Incoming Reinstalled on the BC tower after cleaning and inspection in the lab after being removed after the tower fell last week
5078 2021-01-29 Bouldin Corn Narrow Band PRI Incoming Removed Lab none Removed due to the tower falling over in the storm near midnight on 2021-01-26/27.
4281 2019-12-13 Lab none Installed Bouldin Corn Narrow Band PRI Incoming Re-installed at Bouldin Corn after re-assembling tower. This hemispherical PRI sensor was installed in the incoming position.
4249 2019-12-02 Bouldin Corn Narrow Band PRI Incoming Removed Lab none Removed from Bouldin Corn site and brought back to the lab after the tower fell down during a rain/wind storm on 2019-11-26.
2731 2017-04-26 Lab none Installed Bouldin Corn Narrow Band PRI Incoming Installed at the Bouldin Corn site with the initial set up of the tower.