Equipment and Calibration History
History for Forerunner-Eosense GP-001 GP20160096
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
4858 | 2020-10-08 | Lab none | Shipped | Factory none | Sent to Eosense for inspection |
4852 | 2020-10-05 | East End CO2 probe | Removed | Lab none | Removed from EE because it still rails high in air and in water. Will send it back to the factory |
4850 | 2019-10-02 | Lab none | Installed | East End CO2 probe | Installed at EE off the north side of the tower. |
4111 | 2019-09-20 | Lab none | Tested | Lab none | Tested in the lab, and seems to be responding fine against another 1% probe. Not sure what the issue was in the field. However, the connection between the sensor and the screw connector is loose, so it should be sealed before re-deployment. |
4108 | 2019-09-18 | East End CO2 probe | Removed | Lab none | Removed from East Pond because it was railed high even in air. |
4097 | 2019-09-04 | Lab none | Installed | East End CO2 probe | The CO2 probe attached to the plastic chain to hang next to the miniDot. |