Equipment and Calibration History

History for Campbell Sci. CR10X 47772

Rec No.DateLoc FromTitleLoc ToNotes
5890 2022-06-07 Tonzi Removed Lab none Disconnected and packed up on 05/26 but brought back to the lab today - no longer needed
3989 2019-05-30 Lab none Installed Tonzi Installed near an oak tree about 25m north of the Floor solar panels to support two IRTs
3933 2019-04-16 Tonzi Removed Lab none Removed with the wooden cal panel for the FLIR because cows chewed the TC wires and the new cal panel is better
2504 2016-10-13 Tonzi Removed Lab none Removed from the non-functioning sap flow station north of the road