Equipment and Calibration History

History for Kipp & Zonen PQS 1 140441

Rec No.DateLoc FromTitleLoc ToNotes
5094 2021-02-03 Lab none Installed Bouldin Corn PAR Sensor Reflected Reinstalled on the BC tower after cleaning and inspection in the lab after being removed after the tower fell last week
5075 2021-01-29 Bouldin Corn PAR Sensor Reflected Removed Lab none Removed due to the tower falling over in the storm near midnight on 2021-01-26/27. Completely submerged
4284 2019-12-13 Lab none Installed Bouldin Corn PAR Sensor Reflected Re-installed at Bouldin Corn in outgoing position after re-assembling tower.
4251 2019-12-02 Bouldin Corn PAR Sensor Reflected Removed Lab none Removed from Bouldin Corn site and brought back to the lab after the tower fell down during a rain/wind storm on 2019-11-26.
2720 2017-04-26 Lab none Installed Bouldin Corn PAR Sensor Reflected Installed in the outgoing position at the Bouldin Corn site with the initial set up of the tower.
1975 2014-09-09 Factory none Calibration Factory none Initial factory calibration: 8.36 uV/(umol/m2/s), 470 Ohm: y=mx+b 119.6 0