Equipment and Calibration History
History for Campbell Sci. CS655 17131
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
6559 | 2024-01-30 | Lab none | Installed | Mayberry none | Installed at MB in a tule patch southeast of the tower (~50cm from the staff gauge). This is a test to see if we can continuously track porewater salinity changes. |
6072 | 2022-11-02 | Bouldin Alfalfa-ADEX Soil Moisture Probe Bouncer A | Removed | Lab none | Removed from about 2m south of the Bouncer tower at -10cm at the end of the 2022 advection experiment |
5867 | 2022-04-25 | Lab none | Installed | Bouldin Alfalfa-ADEX Soil Moisture Probe Bouncer A | Installed about 2m south of the Bouncer tower at -10cm for the advection experiment |
5676 | 2022-02-03 | Hill Slough Soil Moisture Probe B | Removed | Lab none | Removed from Hill Slough because we weren't getting any interesting data from it--soils were staying saturated though the tidal cycle |
5191 | 2021-03-11 | Lab none | Installed | Hill Slough none | Installed at Hill Slough with site setup. Not sure of sensor depth yet (either -8cm or -16cm). |
4344 | 2020-01-30 | East Pond Soil Moisture Probe B | Removed | Lab none | Removed with the decommissioning of the EP tower and bought back to the lab. |
3428 | 2018-04-17 | Lab none | Installed | East Pond Soil Moisture Probe B | Installed at EP tower as part of initial site set up near profile B (South). |