Equipment and Calibration History

History for Campbell Sci. CR6 2113

Rec No.DateLoc FromTitleLoc ToNotes
3325 2018-02-07 Lab none Installed Tonzi Installed on Tonzi Tower for the Vaisala GMP CO2 profile.
3314 2018-02-01 Lab none Upgrade Lab none Upgraded OS from CR6.Std.03 to CR6.Std.07.02. The older OS has a known issue where the CR6 is unresponsive until the internal lithium battery is removed and reinstalled. After upgrading the OS, I used the "Network Services" tab to enable FTP with the username tower and the usual password.
2520 2016-11-02 Vaira Removed Lab none Removed from Vaira with the radiometer inter-comparison system that was on a stand alone tripod.
2507 2016-10-20 Twitchell Rice Moved Vaira Moved with radiometer test tripod from Twitchell Rice to Vaira Ranch to compare against Ione sensors.
2479 2016-10-06 Lab none Installed Twitchell Rice Installed in the Golden Radiometer experiment at Twtichell Rice.
1965 2015-08-21 Factory Calibration Factory Initial factory calibration. Recommended interval: 3 years of service.