Equipment and Calibration History
History for Vaisala GMM222 L2010069
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
6023 | 2022-10-05 | Tonzi-SoilCO2 CO2 Probe Tree1 Profile -0.02 | Removed | Lab none | The soil co2 gradient system has not been in good condition for a long time. Finally getting around to removing the equipment from the field: Tree1 -2cm |
3058 | 2017-09-14 | Lab none | Installed | Tonzi CO2 Probe Tree1 Profile -0.02 | Installed at Tonzi in the Tree 1 profile at -2cm after lab calibration. This is a new installation with new holes dug. |
3012 | 2017-08-25 | Tonzi CO2 Probe Tree1 Profile -0.02 | Removed | Lab none | Removed from Tonzi Tree 1 profile at -2 cm position for calibration |
2191 | 2016-02-23 | Lab none | Installed | Tonzi CO2 Probe Tree1 Profile -0.02 | Installed in the Tonzi Tree 1 profile at -2cm after lab calibration. |
2160 | 2016-02-04 | Tonzi CO2 Probe Tree1 Profile -0.02 | Removed | Lab none | Removed from Tonzi Tree profile at -2cm for calibration |
2038 | 2015-11-03 | Lab none | Installed | Tonzi CO2 Probe Tree1 Profile -0.02 | Installed in the Tonzi Tree 1 profile at -2cm to replace sn X5050014 |