Equipment and Calibration History

History for TE Technology HP-127-1.0-1.3-71P P01

Rec No.DateLoc FromTitleLoc ToNotes
2225 2016-04-05 Lab none Installed Vaira Reinstalled at Vaira in the Peltier SHF plate profile at -2cm after fixing broken wire in the lab.
2222 2016-03-23 Vaira Removed Lab none Removed from Vaira at -2cm due to broken wire.
2129 2015-12-21 Lab none Repair Lab none The red lead looked chewed and was broken at its junction to the plate. I soldered a new red wire directly to the junction and a new black wire about 3cm from the plate. Both wires were covered with heat shrink and the junctions to the plate were painted with black Rustoleum paint.
2105 2015-12-02 Vaira Removed Lab none Removed from Vaira at -2cm. The red wire was broken not clear whether corrosion or animal (or shovel) damage
915 2013-02-06 Lab none Installed Vaira Installed in a profile at -2cm to the east of the Vaira radiation tower
920 2013-01-16 Lab none Calibration Lab none Calibrated by Sebastian at University of British Columbia: Multiplier = 99.54 (W/m2)/mV