Equipment and Calibration History
History for Campbell Sci. NL115 9774
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
5048 | 2016-08-12 | Lab none | Installed | Bouldin Alfalfa none | Installed at BA with initial site set up |
1102 | 2013-11-13 | Factory | Returned | Lab none | Returned from Campbell. They replaced the bad eject button and updated the firmware. No charge - under warranty. |
1087 | 2013-11-04 | Lab none | Shipped | Factory | Sent to Campbell for a check on the non-functioning eject button on RMA 18887. |
1086 | 2013-10-18 | Tonzi-Floor | Removed | Lab none | Removed from the Floor Tower. The eject button was not giving a green light to eject the card and the files were getting corrupted on a forced eject. I brought the module in for testing. Replace by sn 6761 |
809 | 2012-10-09 | Lab none | Installed | Tonzi-Floor | Installed with CR1000 sn 50889 to collect flux data at the Floor tower in parallel with winflux. This interface is in the box with the sonic PSU. |