Equipment and Calibration
View History
Equipment Entry
|
Documents
Calibration: cal_LI-7550_snAIU-1570.pdfCalibration: cal_Hukseflux_NR01_sn1570_20111114.pdf
Other: RadiometerTestReport_20130711.pdf
PackingSlip: ps_Licor_20150910.pdf
PackingSlip: ps_Campbell_20120312.pdf
Report: PAR comparison 12-2018 - 2018-12-11
History
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
4607 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
4577 | 2020-07-09 | Sherman Barn Net Radiometer 4-way | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
3585 | 2018-07-11 | Lab none | Installed | Sherman Barn Net Radiometer 4-way | Installed at Sherman Barn on the radiation boom just outside the southwest corner of the cow fence. This is the initial set up of the site. |
3521 | 2018-06-13 | Twitchell Alfalfa Net Radiometer 4-way | Removed | Lab none | Removed with Twitchell Alfalfa site decommissioning. |
996 | 2013-05-24 | Lab none | Installed | Twitchell Alfalfa Net Radiometer 4-way | Installed at the Twitchell Alfalfa site on the radiation post in the field west of the scaffolding |
654 | 2012-06-21 | DWR Corn | Removed | Lab none | Removed from the Corn Tower to be replaced with sn 1454 that had a longer cable spliced on it. |
611 | 2012-05-21 | Lab none | Installed | DWR Corn | Installed on boom at the top northwest corner of the scaffolding at the DWR Corn site |