Equipment and Calibration
View History
Equipment Entry
|
Documents
Calibration: cal_Vaisala_PTB110_snH0160069_20160815.pdfCalibration: cal_Vaisala_PTB110_snH0160069_20120111.pdf
PackingSlip: ps_Campbell_20120312.pdf
RMA: rma_Campbell_24695_20160718.pdf
History
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
2476 | 2016-09-29 | Lab none | Installed | East End Barometer | Tested okay in the lab. Reinstalled to try again. |
2459 | 2016-09-13 | East End Barometer | Removed | Lab none | Was reading low in the field again (around 98kPa) even though it was just returned from Campbell. Removed from EE tower for testing in the lab. |
2447 | 2016-08-31 | Lab none | Installed | East End Barometer | Reinstalled on the East End tower after calibration at Vaisala. |
2434 | 2016-08-24 | Factory | Returned | Returned | Returned from Campbell on RMA 24692 - tested ok and calibrated by Vaisala. |
2448 | 2016-08-15 | Factory | Calibration | Factory | Sent to Vaisala by Campbell for calibration. Campbell says, "Tested against reference. Inspected inside of sensor, no problems found. Successfully calibrated by Vaisala. Tested and confirmed proper function when received back." |
2356 | 2016-07-13 | Lab none | Shipped | Factory | Sent to Campbell on RMA 24692 to be evaluated. |
2324 | 2016-06-24 | East End Barometer | Removed | Lab none | Removed from East End because it was reading low and erratically. |
1715 | 2015-01-20 | Lab none | Installed | East End Barometer | Reinstalled after being removed when the scaffolding fell over. |
1700 | 2015-01-05 | East End Barometer | Removed | Lab none | Removed from the site due to the tower falling over in the wind on 2014-12-30. Likely undamaged. |
1165 | 2013-11-25 | DWR Corn Barometer | Moved | East End Barometer | The DWR Corn / Construction tower was decommissioned and rechristened at its new permanent location at the Twitchell East End Wetland |
610 | 2012-05-21 | Lab none | Installed | DWR Corn | Installed in data logger box on northwest corner of the scaffolding at the DWR Corn site |