History for Kyosera KD140SX-UFBS 11ZV0M0829
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
5135 | 2021-02-26 | Sherman Wetland-Temp1 Solar Panel A | Moved | Hill Slough Solar Panel A | Removed from the decommissioned temporary location for use at Hill Slough |
4354 | 2020-01-30 | East Pond Solar Panel A | Moved | Sherman Wetland-Temp1 Solar Panel A | Removed with the decommissioning of the EP tower and installed at the new SW Temporary site 1250m upwind of the Permanent Tower. |
3432 | 2018-04-17 | Lab none | Installed | East Pond Solar Panel A | Installed at EP tower as part of initial site set up about 12m NNW of the tower |
3097 | 2017-09-13 | East End-Temp2 Solar Panel B | Removed | Lab none | Removed from the East End Temporary Tower 2 - Closed Canopy location with the decommissioning of the site. |
2871 | 2017-06-14 | East End-Temp2 none | Installed | East End-Temp2 Solar Panel B | Installed on the East End Temporary Tower #2 Closed Canpoy location with the initial tower set up. |
4315 | 2017-06-01 | Twitchell Rice 0 | Removed | East End-Temp2 none | Removed from the Twitchell Rice tower location (the tower was removed previously) for use at the East End temporary towers. This panel was left at the Temp 2 (closed vegetation) site to be installed later. |
578 | 2012-04-24 | Lab none | Installed | Twitchell Rice | Installed to power the site. The solar panels are on the the wooden base to the north of the box. Old panels are disconnected |