Field Notes
<--2011-07-21 11:30:00 | 2011-08-04 11:00:00-->Other sites visited today: Twitchell Rice | Mayberry
Phenocam link: Searching...
Sherman Island: 2011-07-28 11:00:00 (DOY 209)
Author: Joe Verfaillie
Others: Jaclyn, Dennis, Jose, Maribel
Summary: Checked CR10X met program and made changes, three new LED sensors tested.
Sherman
2011-07-28 I arrived about 11PDT with Jaclyn, Dennis, Jose and Maribel. It was warm, clear and sunny. A very mild day for the end of July. Most of the pepper weed is done with flowering and looks brownish. I worked on the CR10x met program. It seemed to be working but air pressure might have been stored in the ShelterT column. I also added a counter to record the number of times the 10 second program runs. The *B status from the data logger was Program signature: 50092 OS signature: 56928 Bytes Memory: 0256 No. E08 errors: 00 No. of table overruns: 00 OS Version: 9801.0 Revision Number: 0023 Lithium Battery: 3.0753 Low 12V counter: 00 Extended memory error: 00 Extended memory erase: +0000 The PRT of the CNR1 seems to be bad again. Maybe it is the resistor bridge. |
3 photos found
20110728SI_Site.jpg ( 2011-07-28 10:53:00 ) Full size: 2560x1920
Pepper weed and the Sherman eddy tower
SI_webcam_20112091515.jpg ( 2011-07-28 15:15:04 ) Full size: 640x480
Bird and cows
SI_webcam_20112101745.jpg ( 2011-07-29 17:45:04 ) Full size: 640x480
Cow
7 sets found
1 SI_mp graphs found
11 SI_met graphs found
Can't check SI_mixed
2 SI_mixed graphs found
5 SI_flx graphs found
No data found for SI_soilco2.
Can't check TWSI_mixed
Can't check SIMBTWEE_met