Field Notes
<--2020-02-06 13:15:00 | 2020-02-20 11:55:00-->Other sites visited today: Bouldin Corn | Vaira | Tonzi
Phenocam link: Searching...
West Pond: 2020-02-12 09:21:00 (DOY 43)
Author: Ariane Arias-Ortiz
Others:
Summary: Regular monthly porewater collection
Joe, Daphne and I arrived at West Pond at 9:21 am. They dropped me off on their way to Tonzi. It was a sunny day with a light breeze. The wetland was dry and there was no standing water anywhere except within the structure of the riser weirs (about 50 cm of water). Therefore, I mostly collected porewaters across the footprint (tower, 0.5, 0.7, 0.9). The water table depth was below -20 cm at the tower and 0.5 footprint, while it was below -30 cm at the 0.7 and 0.9 locations. Porewater readings averaged: Conductivity: 660 uS Salinity: 0.3 ppt pH: 6 The water inlet has been closed permanently for the last 3 months. I opened it for a few minutes at the end of the day (2:04 pm), to get a water sample for the "river" endmember. I used sippers to collect the porewaters, however SedPoints2 will be installed in March/April at the tower, 0.5, 0.7, 0.8 and 0.9 footprint. |
0 photos found
8 sets found
Can't check WP_DO
1 WP_DO graphs found
14 WP_met graphs found
5 WP_flux graphs found
Can't check MBWPEESWGT_mixed
Can't check MBEEWPSWEPGT_cam
Can't check MBSWEEWPBCBA
1 WP_processed graphs found
No data found for WP_arable.