Field Notes
<--2019-12-16 12:55:00 | 2020-01-07 12:00:00-->Other sites visited today: Bouldin Corn | Bouldin Alfalfa | East End
Phenocam link: Searching...
West Pond: 2019-12-17 09:15:00 (DOY 351)
Author: Ariane Arias-Ortiz
Others: Joe
Summary: Surface and porewater collection
Joe dropped me off at West Pond at 9:15 am. The water level was low. I took surface water samples at the tower, inlet, outlet and at the old chamber platform close to the inlet where standing water patches remained. There was no standing water across the footprint. Pore-waters were collected using puspoints at the 0.5 footprint. Water could not be pulled at -10 cm (water table was below this depth) but at -20, -30, -40 and -50 cm. A permanent station will be installed for monthly monitoring. Readings at the tower: Conductivity (corr.): 552 uS Salinity: 0.3 ppt pH: 6.22 Temp: 6.8ºC Time: 9:41 am Joe picked me up at 1:30 pm. On our way back we run into Bryan Brock who told us that the outlet system will be redesigned in spring as the pond does not hold water anymore. Until then, the inlet will remain closed. |
0 photos found
8 sets found
Can't check WP_DO
1 WP_DO graphs found
14 WP_met graphs found
5 WP_flux graphs found
Can't check MBWPEESWGT_mixed
Can't check MBEEWPSWEPGT_cam
Can't check MBSWEEWPBCBA
1 WP_processed graphs found
No data found for WP_arable.