<--2009-12-09 10:00:00 | 2009-12-28 09:30:00-->
Other sites visited today: Twitchell Rice

Sherman Island: 2009-12-18 11:30:00 (DOY 352)
Author: Joe Verfaillie
Others: Siyan, Lianhong

Summary: LI7500 not communicating with CR1000.

Sherman
12/18/2009

Arrived about 11:30 with Siyan and Lianhong. Still very foggy with much dew fall. Cows in the vicinity.

Everything was running. Adjusted bypass valve in trailer LGR to bring pressure back to 143Torr.

Cleaned LGR filters on permanent tower. About 16 inches of water in downstream water trap – drained. Adjusted bypass valve to bring pressure back to 143Torr.

LI7500 was not communicating with CR1000. Check power, data cables, SDM address and LI7500 with laptop and found no problems. Cycling power on CR1000 seemed to fix the problem.

Cleaned radiometers and permanent tower LI7500. LED NDVI sensor may have condensation inside.

0 photos found

Graphs display:
7 sets found

No data found for SI_mp.
11 SI_met graphs found

Solar Radiation

Energy

Soil Temperatures Set 1

Soil Temperatures Set 2

Soil Temperatures Set 3

Soil Temperature at -16cm

LED NDVI Sensor Output

Solar Radiation from CNR1

Sherman Island Rain

Sherman Well Level

Box Temperatures

Can't check SI_mixed
2 SI_mixed graphs found

Theta Probes

Sherman Island Air Temperatures

No data found for SI_flx.
No data found for SI_soilco2.
Can't check TWSI_mixed
Can't check SIMBTWEE_met

 
 

Login
Select Notes:

This material is based upon work supported by the National Science Foundation and US Department of Energy. Any opinions, findings, conclusions, or recommendations expressed in the material are those of the author(s) and do not necessarily reflect the views of the supporters.