Equipment and Calibration History

History for Decagon-METER SRS-Ni NDVI 2046503402

Rec No.DateLoc FromTitleLoc ToNotes
5187 2021-03-11 Lab none Installed Hill Slough Narrow Band NDVI Reflected Installed at Hill Slough with site setup.
4961 2020-11-12 Sherman Wetland-Temp1 Narrow Band NDVI Reflected Removed Lab none Removed with decommissioning of Sherman Wetland Temp tower. Brought back to the lab for cleanup.
4346 2020-01-30 East Pond Narrow Band NDVI Reflected Moved Sherman Wetland-Temp1 Narrow Band NDVI Reflected Removed with the decommissioning of the EP tower and installed at the new SW Temporary site 1250m upwind of the Permanent Tower.
3467 2018-05-16 Lab none Installed East Pond Narrow Band NDVI Reflected Installed on the East Pond tower in the outgoing postion
3462 2018-04-25 Vaira Narrow Band Reflected Removed Lab none Removed from outgoing position on the Vaira after comparing with LED sensor
2979 2017-08-17 Lab none Installed Vaira Narrow Band Reflected Installed on the Vaira Tower in the outgoing position
3465 2017-08-16 Lab none Maintenance Lab none SDI-12 address set to E to indicated outgoing position