4298 2019-12-13 Lab none Installed Bouldin Corn Data Logger Met Re-installed at Bouldin Corn after re-assembling tower.
4266 2019-12-02 Bouldin Corn Data Logger Met Removed Lab none Removed from Bouldin Corn site and brought back to the lab after the tower fell down during a rain/wind storm on 2019-11-26.
3342 2017-04-26 Lab none Installed Bouldin Corn Data Logger Met Installed on the Bouldin Corn Tower to collect the met data with the initial set up of the site.