Equipment and Calibration History

History for Campbell Sci. AM16/32A 1237

Rec No.DateLoc FromTitleLoc ToNotes
6429 2023-10-04 Tonzi Multiplexer Tower Removed Lab none Removed from the Tower top due to spikes on multiple channels. Replaced by sn 31675
945 2013-03-13 Lab none Installed Tonzi-Tower Installed in the cr23x box near the top of the tower in preparation for adding new diffuse PAR and 4-band radiometer. Currnetly not connected.
881 2012-09-06 Tonzi Removed Lab none Removed with all the above ground components of the C1 sap flow station. This sap flow station has not been working for a while and there are no plans to continue sap flow measurements in the future.