History for Campbell Sci. CFM100 4994

Rec No.DateLoc FromTitleLoc ToNotes
2792 2017-05-24 Vaira Removed Lab none Removed from the Vaira Tower. Replaced by the new Licor GHG system from Ameriflux.
910 2012-08-22 Lab none Installed Vaira Installed with CR1000 sn 23865 to collect flux data at the Vaira tower in parallel with winflux. This data logger is in the box with the sonic PSU.
647 2012-02-15 Sherman Island Removed Lab none Removed from the Sherman CR1000 to be replaced by NL115 sn 6761 to allow ethernet connection of LI7700.