History for Campbell Sci. AM25T 6769

Rec No.DateLoc FromTitleLoc ToNotes
1713 2015-01-20 Lab none Installed East End Multiplexer Thermocouples Reinstalled after being removed when the scaffolding fell over.
1698 2015-01-05 East End Multiplexer Thermocouples Removed Lab none Removed from the site due to the tower falling over in the wind on 2014-12-30. Likely undamaged.
1163 2013-11-25 DWR Corn Multiplexer Thermocouples Moved East End Multiplexer Thermocouples The DWR Corn / Construction tower was decommissioned and rechristened at its new permanent location at the Twitchell East End Wetland
740 2012-05-21 Lab none Installed DWR Corn Installed in the data logger box on the DWR Corn scaffolding.