Equipment and Calibration History
History for Campbell Sci. HygroVUE10 E3452
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
6186 | 2023-02-14 | Lab none | Installed | Gilbert Tract RH & Temp | Installed on GT tower to replace HMP45 W0730036, which was removed for railing RH |
6115 | 2022-11-30 | Bouldin Alfalfa-ADEX RH & Temp Main Upper | Removed | Lab none | Removed from the main tower and brought back to the lab at the end of the ADEX intercomparison |
5844 | 2022-04-25 | Lab none | Installed | Bouldin Alfalfa-ADEX RH & Temp Main Upper | Installed on a new post at the main tower at 6.08m alg for the advection experiment at BA |