History for Apogee S2-411 1054
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
5983 | 2022-09-12 | Lab none | Tested | Lab none | Plugged in to a CR1000 in the lab but 650out is still bad. It's stuck at about -3.7. |
5976 | 2022-08-30 | East End Narrow Band NDVI Reflected B | Removed | Lab none | Removed from EE and brought back to the lab for testing. 650out data is bad. |
5228 | 2021-03-30 | Lab none | Installed | East End Narrow Band NDVI Reflected B | Installed at EE on radiation boom in outoing position |
5165 | 2021-03-04 | East End Narrow Band NDVI Reflected B | Removed | Lab none | Removed from East End and brought back to the lab for testing. It had some NANs, but might've been influenced by the misbehaving NDVI_in sensor that was wired to the same control port. |
4664 | 2020-08-05 | Lab none | Installed | East End Narrow Band NDVI Reflected B | Installed at EE in the NDVI outgoing position |
4621 | 2020-07-15 | Lab none | Initial settings | Lab none | Set up as SDI-12 address H for NDVIout |