Equipment and Calibration
View History
Equipment Entry
|
Documents
Calibration: Forerunner_GP001_20140021.pdfCalibration: Forerunner_GP001_20140022.pdf
Calibration: Forerunner_GP001_20140023.pdf
Calibration: Forerunner_GP001_20140024.pdf
Calibration: Forerunner_GP001_20140025.pdf
Calibration: Forerunner_GP001_20140026.pdf
Calibration: cal_FR-Eosense_GP001_sn_GP20140010_20140609.pdf
Calibration: cal_FR-Eosense_GP001_sn_GP20140011_20140609.pdf
Calibration: cal_FR-Eosense_GP001_snGP20140009_20140609.pdf
Calibration: cal_Eosense_GP-001_snVarious_20170526.pdf
PackingSlip: ps_Campbell_20150928.pdf
Report: Eosense CO2 Probe Compare - 2018-04-23
Report: Eosense CO2 Probe Compare - 2018-09-07
Report: eosGP comparison - 11/2023 - 2023-11-16
History
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
559 | 2012-05-02 | Sherman Island | Removed | Lab none | Removed from the soil CO2 box at Sherman. In trying to get a relay to cycle power on three Vaisala probes this data logger was swapped out. Turns out the problem was with the relay wiring not the data logger. |
2369 | 2011-06-30 | Lab none | Installed | Sherman Island | Installed with the upgrade of the soil CO2 system. |
299 | 2011-02-03 | Tonzi | Removed | Lab none | Removed from Tonzi Floor. This data logger was recording up and down PAR, net and shf from the open space near the floor solar panels and net, RH and T and shf from under the trees. |
97 | 2010-03-19 | Lab none | Installed | Tonzi | Given to Siyan to install in the supplemental solar radiation measurements near the tram and floor system. |
60 | 2010-02-16 | Lab none | Maintenance | Lab none | I found this data logger in the lab. It was behaving poorly both over a Loggernet serial connection and with key pad. I was able to upload latest OS firmware 2.2. Seems okay now.
Using for testing of new Sherman Island code. wiring panel #10802 |
298 | 1999-10-18 | Factory | Calibration | Factory | Factory calibration. |