Equipment and Calibration History

History for Campbell Sci. CR10X 20140

Rec No.DateLoc FromTitleLoc ToNotes
559 2012-05-02 Sherman Island Removed Lab none Removed from the soil CO2 box at Sherman. In trying to get a relay to cycle power on three Vaisala probes this data logger was swapped out. Turns out the problem was with the relay wiring not the data logger.
2369 2011-06-30 Lab none Installed Sherman Island Installed with the upgrade of the soil CO2 system.
299 2011-02-03 Tonzi Removed Lab none Removed from Tonzi Floor. This data logger was recording up and down PAR, net and shf from the open space near the floor solar panels and net, RH and T and shf from under the trees.
97 2010-03-19 Lab none Installed Tonzi Given to Siyan to install in the supplemental solar radiation measurements near the tram and floor system.
60 2010-02-16 Lab none Maintenance Lab none I found this data logger in the lab. It was behaving poorly both over a Loggernet serial connection and with key pad. I was able to upload latest OS firmware 2.2. Seems okay now.

Using for testing of new Sherman Island code.

wiring panel #10802
298 1999-10-18 Factory Calibration Factory Factory calibration.