Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
6088 | 2022-11-02 | Bouldin Alfalfa-ADEX Solar Panel Edge B | Removed | Lab none | Removed from about 10m north of the Edge tower at the end of the 2022 advection experiment |
5874 | 2022-04-25 | Lab none | Installed | Bouldin Alfalfa-ADEX Solar Panel Edge B | Installed about 10m north of the Edge tower at -10cm for the advection experiment |
5809 | 2022-04-20 | Mayberry | Removed | Lab none | Removed from MB and brought back to the lab. It will be used for the advection experiment this summer. |
3493 | 2010-10-14 | Lab none | Installed | Mayberry | Installed with the initial set up of the site |