Equipment and Calibration History

History for Shell SQ75 024398E-1-26-04-99974

Rec No.DateLoc FromTitleLoc ToNotes
6088 2022-11-02 Bouldin Alfalfa-ADEX Solar Panel Edge B Removed Lab none Removed from about 10m north of the Edge tower at the end of the 2022 advection experiment
5874 2022-04-25 Lab none Installed Bouldin Alfalfa-ADEX Solar Panel Edge B Installed about 10m north of the Edge tower at -10cm for the advection experiment
5809 2022-04-20 Mayberry Removed Lab none Removed from MB and brought back to the lab. It will be used for the advection experiment this summer.
3493 2010-10-14 Lab none Installed Mayberry Installed with the initial set up of the site