Equipment and Calibration History

History for Shell SQ75 020854E-6-03-02-06825

Rec No.DateLoc FromTitleLoc ToNotes
6751 2024-07-08 Lab none Loaned Loaned none Loaned to Patty for a 3-month AMP intercomparison at her new Chico agricultural tower.
6075 2022-11-02 Bouldin Alfalfa-ADEX Solar Panel Bouncer A Removed Lab none Removed from about 10m south of the Bouncer tower at the end of the 2022 advection experiment
5871 2022-04-25 Lab none Installed Bouldin Alfalfa-ADEX Solar Panel Bouncer A Installed about 10m south of the Bouncer tower for the advection experiment
5810 2022-04-20 Mayberry Removed Lab none Removed from MB and brought back to the lab. It will be used for the advection experiment this summer.
3494 2010-10-14 Lab none Installed Mayberry Installed with the initial set up of the site