Equipment and Calibration History

History for Vaisala GMP343 N2210010

Rec No.DateLoc FromTitleLoc ToNotes
6581 2024-02-27 Lab none Installed Tonzi CO2 Probe Tower Profile 1.8 Reinstalled in the lower-mid location of the Tower co2 profile after testing in the lab.
6561 2024-02-09 Tonzi CO2 Probe Tower Profile 1.8 Removed Lab none Removed from the lower mid location on the Tower due to bad readings and to be calibrated
3294 2018-01-15 Lab none Installed Tonzi Installed at the 2nd lowest location in the tower co2 profile - not running yet due to data logger failure.