Equipment and Calibration History

History for Campbell Sci. AM16/32B 21690

Rec No.DateLoc FromTitleLoc ToNotes
4300 2019-12-13 Lab none Installed Bouldin Corn Multiplexer Met Re-installed at Bouldin Corn after re-assembling tower.
4268 2019-12-02 Bouldin Corn Multiplexer Met Removed Lab none Removed from Bouldin Corn site and brought back to the lab after the tower fell down during a rain/wind storm on 2019-11-26.
2713 2017-04-26 Lab none Installed Bouldin Corn Multiplexer Met Installed at the Bouldin Corn site with the initial set up of the tower.