Equipment and Calibration History
History for Campbell Sci. CR1000 66251
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
4298 | 2019-12-13 | Lab none | Installed | Bouldin Corn Data Logger Met | Re-installed at Bouldin Corn after re-assembling tower. |
4266 | 2019-12-02 | Bouldin Corn Data Logger Met | Removed | Lab none | Removed from Bouldin Corn site and brought back to the lab after the tower fell down during a rain/wind storm on 2019-11-26. |
3342 | 2017-04-26 | Lab none | Installed | Bouldin Corn Data Logger Met | Installed on the Bouldin Corn Tower to collect the met data with the initial set up of the site. |