Rec No. | Date | Loc From | Title | Loc To | Notes |
6202 |
2023-03-02 |
Lab none |
Tested |
Disposed none |
This charge controller hasn't been showing solar amps. I took it apart and cleaned out a bunch or large dead ants. I found two diodes and one capacitor that looked a little fouled but not obviously broken. I'm not sure I have the tools/skills to do any more. I cleaned it up, put it back together and tested it. Now the screen shows nonsense - different on each power cycle. I think it's a goner. Put it in the e-waste box. |
6210 |
2023-03-01 |
Tonzi Solar Controller Soil CO2 |
Removed |
Lab none |
This solar controller has not been showing solar amps and doesn't seem to charge batteries. I brought it in for testing |
4555 |
2020-07-07 |
Lab none |
Installed |
Tonzi none |
Installed in the Soil CO2 box under the tree at Tonzi. I swapped out an old 1st gen 30A model sn 186580399. |
4092 |
2019-08-19 |
Bouldin Alfalfa-ReleaseEx Solar Controller Near |
Removed |
Lab none |
Removed from the closer (day time) CH4 release point. The secondary tower and farther release point will continue. |
4081 |
2019-08-16 |
Lab none |
Installed |
Bouldin Alfalfa-ReleaseEx Solar Controller Near |
Installed for CH4 release experiment. This unit was part of the closer (day time) release point. |
3458 |
2018-05-10 |
East Pond Solar Controller Secondary |
Removed |
Lab none |
Removed from East Pond. Replaced by 30A controller. |
3433 |
2018-04-17 |
Lab none |
Installed |
East Pond Solar Controller Secondary |
Installed at EP tower as part of initial site set up about 12m NNW of the tower |
3141 |
2017-10-16 |
East End-Temp2 Solar Controller |
Removed |
Lab none |
Removed from the East End Temporary Tower #2 - Closed Canopy with the decommissioning of the site. |