Equipment and Calibration
View History
Equipment Entry
|
Documents
PackingSlip: ps_AZWindSun_20120312.pdfHistory
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
2119 | 2015-12-08 | Lab none | Installed | East End Solar Panel C | This solar panel was added to the existing two panels. |
1619 | 2014-10-09 | Mayberry-Portable | Removed | Lab none | Removed with the rest of the portable tower equipment. End of the portable tower campaign. |
1317 | 2014-04-28 | Lab none | Installed | Mayberry-Portable | Installed with the Mayberry portable tower. Chained and locked to the frame of the truck. |