Equipment and Calibration History
History for Kyosera KD140SX-UFBS 11ZV0M0855
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
5133 | 2021-02-26 | Sherman Wetland-Temp1 Solar Panel C | Moved | Hill Slough Solar Panel C | Removed from the decommissioned temporary location for use at Hill Slough |
4356 | 2020-01-30 | East Pond Solar Panel C | Moved | Sherman Wetland-Temp1 Solar Panel C | Removed with the decommissioning of the EP tower and installed at the new SW Temporary site 1250m upwind of the Permanent Tower. |
3431 | 2018-04-17 | Lab none | Installed | East Pond Solar Panel C | Installed at EP tower as part of initial site set up about 12m NNW of the tower |
3120 | 2017-10-04 | East End-Temp3 Solar Panel A | Removed | Lab none | Removed with the decommissioning of Temporary Tower #3 - Boardwalk site. |
2886 | 2017-06-23 | Lab none | Installed | East End-Temp3 Solar Panel A | Installed at the East End Temporary Tower #3 Boardwalk location with the initial setup of the site. |
2772 | 2017-05-18 | West Pond Solar Panel C | Removed | Lab none | Removed from West Pond to make way for new 24V system. |
581 | 2012-05-02 | Lab none | Installed | West Pond Solar Panel C | Installed to power the site at West Ponds. The solar panels are on top of one level of scaffolding just inside the edge of the east pond. |