Equipment and Calibration

View History

Equipment Entry

Instrument:Solar Panel
Manufacture:Kyosera
Model No:KD140SX-UFBS
Serial No:11ZV0M0836
Tag No:
Acquisition Date:2012-03-12
Project:DWR-Wetland
Location on 2022-04-20:Mayberry,
Notes: 140W, 12V

Documents

PackingSlip: ps_AZWindSun_20120312.pdf

History

Rec No.DateLoc FromTitleLoc ToNotes
5811 2022-04-20 Lab none Installed Mayberry none Installed at MB to replace the 3 Shell solar panels that were removed today to be used for the advection experiment this summer. This panel has been resealed with Qsil and window film.
5661 2022-01-14 Lab none Tested Lab none This panel has totally crack glass and two big divots. I tested it outside on a clear day. Data from the Delta says max SWin at this time of year is around 500W. Specs on the back say 6.3A at 800W. I got 3.4A. If you do the ratio you get 3.9A at 500W. As tested I did not have an unobstructed view of the sky and cracks in the glass but no shadows on the panel and a reasonable angle. So maybe worth resealing. Use Qsil 216: http://americansolarsupply.com/stores.html#!/QSil-216-Encapsulant/c/12380606/offset=0&sort=normal
5195 2021-03-11 Hill Slough Solar Panel C Removed Lab none This panel was removed from the lowest position at Hill Slough because its glass face is broken. It was replaced by sn 11ZV0M0828
5134 2021-02-26 Sherman Wetland-Temp1 Solar Panel B Moved Hill Slough Solar Panel B Removed from the decommissioned temporary location for use at Hill Slough
4355 2020-01-30 East Pond Solar Panel B Moved Sherman Wetland-Temp1 Solar Panel B Removed with the decommissioning of the EP tower and installed at the new SW Temporary site 1250m upwind of the Permanent Tower.
3430 2018-04-17 Lab none Installed East Pond Solar Panel B Installed at EP tower as part of initial site set up about 12m NNW of the tower
3119 2017-10-04 East End-Temp3 Solar Panel B Removed Lab none Removed with the decommissioning of Temporary Tower #3 - Boardwalk site.
2885 2017-06-23 Lab none Installed East End-Temp3 Solar Panel B Installed at the East End Temporary Tower #3 Boardwalk location with the initial setup of the site.
2774 2017-05-18 West Pond Solar Panel A Removed Lab none Removed from West Pond to make way for new 24V system.
565 2012-05-02 Lab none Installed West Pond Solar Panel A Installed to power the site at West Ponds. The solar panels are on top of one level of scaffolding just inside the edge of the east pond.