Field Notes
<--2024-10-23 13:35:00 | 2024-11-06 11:50:00-->Other sites visited today: Hill Slough | Rush Ranch
Phenocam link: Searching...
Bouldin Alfalfa: 2024-10-24 13:15:00 (DOY 298)
Author: Daphne Szutu
Others: Joe, Kyle
Summary: Moved tower slightly farther into the field, reinstalled ground sensors and all 3 soil profiles in the field
2024-10-24 Bouldin Alfalfa Joe, Kyle, and I arrived at 13:15 PST. It was sunny and mild. Yesterday Kuno and I were here to download data. Today, the three of us are moving the tower farther into the field so we can get the radiometers and soil sensors into the wheat. I talked to Jose on Tuesday and he said they have finished planting and are done with tractor work until harvest. We can drive into the field for now, but once the wheat starts growing he would prefer we park on the dirt road and walk in. We pulled up the fence posts, removed the single soil profile and Theta probe, and secured the jack feet to the scaffolding with bungee cords. We moved the tower about 2m into the field and rotated it so the radiometers are pointed south. Previously this tower was aligned with the field to minimize disturbance during alfalfa mowing/raking. We squared and leveled the tower. Joe and Kyle moved the exiting soil profile (set#2/B) and the Theta probe from under the tower into the field. They also installed the other two soil profiles (sets 1/A, 3/C), the undercanopy PAR sensor, and the shorter Sentek soil profile (6 depths, 60cm deep). Sensor locations and status Under Canopy PAR WAS: Hanging sideways on the tower IS: In the field, 240cm at 230deg from SW corner of scaffolding Delta-T soil moisture sn M003369 WAS: Under the scaffolding at -20cm IS: In the field at -20cm, 155cm at 276deg from SW corner of scaffolding Ground sensors set#1 WAS: Removed to lab IS: 500cm at 300deg from NW corner of scaffolding Soil moisture sn 17127, z=-5cm SHF sn 10866, z=-2cm TCs 1-5 repaired Ground sensors set #2 WAS: Under tower at same depths IS: 310cm at 210deg from SW corner of scaffolding Soil moisture sn 17135, z=-5cm SHF sn 11334, z=-2cm TCs 6-10 on mux, one thermocouple retaped from top position to middle (3rd) position Ground sensors set #3 WAS: Removed to lab IS: 400cm at 250deg from NW corner of scaffolding Soil moisture sn 17132, z=-5cm, tines bent back to parallel SHF sn 11332, z=-2cm TCs 11-15 repaired We measured the sonic heading: 286 deg true N We measured the sonic height: 390cm Joe and Kyle reinstalled the fence posts. We removed the extra FD cable and power cable leftover from the Nkira intercomparison. I checked that the GHG data looked reasonable and I collected the met data since yesterday. The 7500 read: 427ppm CO2, 307mmol/m3 H2O, 24.5C, 101.3kPa, 98SS We left at 14:55 PST. |
Estimated Next Mowing: 2024-11-02
1 photos found
20241024BA_TowerMoved.jpg ( 2024-10-24 15:52:16 ) Full size: 1920x1440
After wheat was planted, tower was moved a few meters into the field and rotated so that the radiometers point south.
7 sets found
4 BA_flux graphs found
21 BA_met graphs found
6 BA_arable graphs found
Can't check TATWBABCSB_cam
Can't check MBSWEEWPBCBA
2 BA_processed graphs found
No data found for BA_adex.