Field Notes
<--2003-03-21 00:00:00 | 2003-03-28 09:00:00-->Phenocam link: Searching...
Tonzi: 2003-03-22 00:00:00 (DOY 81)
Author: Ted Hehn
Others:
Summary: Check floor system, install boom arm, mount new power regulator on box tower.
22Mar03 09:30hr Floor system Licor 7500 has both channels pegged at 5.00 volts. Unplug connector on licor probe head base and reconnect. – No help. Disconnect power on sonic and reconnect and Licor 7500 becomes functional. Appears digital/analog converter in sonic had locked up. Install boom arm, pulley and hoist rope on tower. Hoist 15’ aluminum tube for 4th solar panel level up tower and tie on temporarily. Mount new 90 amp power regulator box on tower. Punch 2 inch hole in Jianwu’s pedosphere IRGA enclosure to route probe head cables so they are not pinched in enclosure door. |
Field Data
No tank data
No TZ Well data found
No TZ Moisture Point data found
No VR Moisture Point data found
No TZ grass heigth found
No VR grass heigth found
No TZ Tree DBH found
No water potential data found
No TZ Grass Biomass data found
No TZ OakLeaves Biomass data found
No TZ PineNeedles Biomass data found
0 photos found
16 sets found
No data found for TZ_Fenergy.
11 TZ_tmet graphs found
No data found for TZ_soilco2.
Can't check TZ_mixed
3 TZ_mixed graphs found
No data found for TZ_fflux.
8 TZ_fmet graphs found
No data found for TZ_tram.
No data found for TZ_co2prof.
No data found for TZ_irt.
No data found for TZ_windprof.
No data found for TZ_tflux.
2 TZ_sm graphs found
Can't check TZ_met
1 TZ_met graphs found
Can't check TZVR_mixed
No data found for TZ_osu.
No data found for TZ_fd.
Tonzi Z-cam data