Field Notes
<--2018-01-16 10:40:00 | 2018-01-31 09:30:00-->Other sites visited today: Mayberry | East End | West Pond
Phenocam link: Searching...
Twitchell Alfalfa: 2018-01-23 13:30:00 (DOY 23)
Author: Joe Verfaillie
Others: Daphne
Summary: Tried to add solar panel, remounted diffuse PAR, fixed holes in battery box.
Twitchell Alfalfa 2018-01-23 Daphne and I arrived at 13:30. It was cool and sunny with clouds on the horizon. Lots of grass and nettles sprouting here. This site has been losing power too. The same 1/17 to 1/18 noon is missing here as at East End. I thought to add a third solar panel here but as I got it connected, realized this power system is 24V and an odd number of solar panels won’t work. This used to be necessary for the older Vaisala CO2 power and control boxes, but might not be needed now that we are using the newer GMM boards. No power upgrade for now. I did screw in the anchor and reaffix the security chain on the two panels here. Daphne put new screens on the two west facing vent holes on the battery box. She also reversed the mounting of the diffuse PAR shortening its mounting arm. This removes the bird roost over the solar panels and makes it easier to reach the sensor for maintenance. I pulled a fence post that used to mark the north end of the soil sensors and might have been casting a small shadow on the solar panels. Daphne spread more castor oil around and filled in some of the squirrel holes. We left at 14:35 |
0 photos found
7 sets found
Can't check TA_met
11 TA_met graphs found
Can't check TA_rad
3 TA_rad graphs found
Can't check TA_flux
5 TA_flux graphs found
Can't check TA_soilco2
7 TA_soilco2 graphs found
1 TA_arable graphs found
1 TA_cam graphs found
Can't check TATWBABCSB_cam